Power Your Home With
THE SUN
1240148
HOURS WORKED
97899
PROJECTS COMPLETE
843547486
WATTS INSTALLED
OUR INSTALL PROCESS
Our team is commited to:
1) Site survey and design 2) Permitting 3) Installation
4) City inspections 5) Utility connection
SYSTEM GUARANTEE WITH SATISFACTION
We Partnered With The Top Solar Installers
​Titan’s dedicated technician will visit the property to confirm the system design, verify measurements, and adjust for shade and obstructions on roof. After the site evaluation, a solar design expert will make any number of adjustments to the customized plan to ensure everything looks and operates perfectly. From site visit to design, it can take between 3 to 5 week
THE BEST IN ROOFTOP SOLAR
Fast Installations
​After the site evaluation, a solar design expert will make any number of adjustments to the customized plan to ensure everything looks and operates perfectly. From site visit to design, it can take between 3 to 5 weeks.
Smarter Processes
​Our dedicated technician will visit the property to confirm the system design, verify measurements, and adjust for shade and obstructions on roof.
Intallation
​After permit approval, Titan will contact the property owner to schedule installation. When Titan’s install team arrives, they will go over the design plans for final approval before they begin. Once the Titan installation crew wraps up the job, they’ll finish by giving the property owner a full Solar 101 on the system. Depending on the size of property and system, this phase takes 1 to 5 days.
Permitting
​After design plans are finalized, they will be submitted by Titan to the local city government Authority Having Jurisdiction (AHJ) for permitting. Permit approvals are subject to schedule of the governing AHJ Department. This can take anywhere from 2 to 8 weeks.